Here is the link to the fall sports streaming schedule.

https://appstatesports.com/news/2023/8/ ... edule.aspx

Big news coming soon?

GastonApp09
Posts: 213
Joined: Mon Oct 26, 2015 9:24 am
School: Appalachian State
Location: Belmont, NC
Has thanked: 78 times
Been thanked: 80 times

Re: Big news coming soon?

Unread post by GastonApp09 » Wed Oct 10, 2018 8:54 am

I guess we will have to wait for the Wednesday afternoon news dump? C'mon 66 you're killing me smalls!
Body stuck in Gaston County...heart stuck in Boone! Go Apps!

falcoapp
Posts: 208
Joined: Mon Mar 17, 2014 3:27 pm
School: Appalachian State
Has thanked: 1 time
Been thanked: 109 times

Re: Big news coming soon?

Unread post by falcoapp » Wed Oct 10, 2018 9:23 am

Threads like these are junk.

User avatar
HighPointApp
Posts: 3594
Joined: Mon Sep 22, 2008 2:15 pm
School: Appalachian State
Has thanked: 1484 times
Been thanked: 562 times

Re: Big news coming soon?

Unread post by HighPointApp » Wed Oct 10, 2018 9:29 am

Click bait

#vegancats - search this up on Twitter or Instagram. Everyone needs a good laugh.
Give 'em Hell!
Class of ‘96

NewApp
Posts: 7491
Joined: Tue Mar 26, 2013 8:59 am
School: Appalachian State
Has thanked: 958 times
Been thanked: 900 times
Contact:

Re: Big news coming soon?

Unread post by NewApp » Wed Oct 10, 2018 9:31 am

GastonApp09 wrote:
Wed Oct 10, 2018 8:54 am
I guess we will have to wait for the Wednesday afternoon news dump? C'mon 66 you're killing me smalls!
Only big news I would be ecstatic about would be Chancellor Everts finding another job and Chancellor Peacock coming back. (just kidding)
NewApp formerly known as JCline
If you can't take it, don't dish it out.
Google SUX

PhillyApp1
Posts: 1234
Joined: Sun Aug 12, 2012 11:52 am
Has thanked: 2695 times
Been thanked: 484 times

Re: Big news coming soon?

Unread post by PhillyApp1 » Wed Oct 10, 2018 10:00 am

I will say 66 you are a much better person than to DANGLE this for 7-10 days .

Next time 2-3 days would be better ;-)

User avatar
AppNation85
Posts: 162
Joined: Sun Sep 03, 2017 4:05 am
School: Appalachian State
Has thanked: 7 times
Been thanked: 60 times

Re: Big news coming soon?

Unread post by AppNation85 » Wed Oct 10, 2018 10:07 am

The big news is that we have won the Sun Belt Championship. They’re just waiting until we win it to announce it.
Twitter: @RankAppState

User avatar
moonshine
Posts: 2138
Joined: Thu Aug 09, 2012 7:25 am
School: Appalachian State
Location: High Country
Has thanked: 283 times
Been thanked: 730 times

Re: Big news coming soon?

Unread post by moonshine » Wed Oct 10, 2018 10:45 am

Not sure if this is the news but some information many might find interesting. The BOG approved the on-campus housing P3 project. Plan is to have a 475 space parking deck where Winkler (Stadium Lot) formerly sat by August 2019. Construction of buildings 100 & 200 from the P3 project with roughly 1,000 beds is slated to start in March of 2019 and set to open in August 2020. Justice and East will be torn down most likely after 100/200 are built. The Stadium Lot building is set to open in August 2021 with around 500 beds. Housing with roughly 625 beds where Justice currently sits is supposed to be completed by August 2022. On campus housing sits at approximately 5,700 and once all this is completed (tear down and construction), App will have roughly 6,000-6,100 beds on campus.

Already known but just a reminder, Owens demolition is set for this December/January '19. Construction of new EZ facility set to begin in March/April 2019. Building is set to begin in 2019-2020 at the old high school site for the track, outdoor tennis and softball.
Picked up via free agency by the High Country All-Stars

User avatar
HighPointApp
Posts: 3594
Joined: Mon Sep 22, 2008 2:15 pm
School: Appalachian State
Has thanked: 1484 times
Been thanked: 562 times

Re: Big news coming soon?

Unread post by HighPointApp » Wed Oct 10, 2018 10:50 am

moonshine wrote:
Wed Oct 10, 2018 10:45 am
Not sure if this is the news but some information many might find interesting. The BOG approved the on-campus housing P3 project. Plan is to have a 475 space parking deck where Winkler (Stadium Lot) formerly sat by August 2019. Construction of buildings 100 & 200 from the P3 project with roughly 1,000 beds is slated to start in March of 2019 and set to open in August 2020. Justice and East will be torn down most likely after 100/200 are built. The Stadium Lot building is set to open in August 2021 with around 500 beds. Housing with roughly 625 beds where Justice currently sits is supposed to be completed by August 2022. On campus housing sits at approximately 5,700 and once all this is completed (tear down and construction), App will have roughly 6,000-6,100 beds on campus.

Already known but just a reminder, Owens demolition is set for this December/January '19. Construction of new EZ facility set to begin in March/April 2019. Building is set to begin in 2019-2020 at the old high school site for the track, outdoor tennis and softball.
Proud to be a Mountaineer!! Can't wait to get back on campus on 11/24. Go Apps!!!
Give 'em Hell!
Class of ‘96

User avatar
boonegoons89
Posts: 70
Joined: Thu Oct 02, 2014 9:15 am
School: Appalachian State
Has thanked: 42 times
Been thanked: 71 times

Re: Big news coming soon?

Unread post by boonegoons89 » Wed Oct 10, 2018 1:24 pm

Image

Yosefus
Posts: 1779
Joined: Sat Sep 05, 2015 11:50 am
School: Appalachian State
Has thanked: 285 times
Been thanked: 665 times

Re: Big news coming soon?

Unread post by Yosefus » Wed Oct 10, 2018 1:34 pm

I can't wait either Spanky.

User avatar
Rekdiver
Posts: 7523
Joined: Mon Aug 13, 2012 1:14 pm
School: Appalachian State
Has thanked: 1427 times
Been thanked: 3707 times

Re: Big news coming soon?

Unread post by Rekdiver » Wed Oct 10, 2018 1:38 pm

HighPointApp wrote:
Wed Oct 10, 2018 10:50 am
moonshine wrote:
Wed Oct 10, 2018 10:45 am
Not sure if this is the news but some information many might find interesting. The BOG approved the on-campus housing P3 project. Plan is to have a 475 space parking deck where Winkler (Stadium Lot) formerly sat by August 2019. Construction of buildings 100 & 200 from the P3 project with roughly 1,000 beds is slated to start in March of 2019 and set to open in August 2020. Justice and East will be torn down most likely after 100/200 are built. The Stadium Lot building is set to open in August 2021 with around 500 beds. Housing with roughly 625 beds where Justice currently sits is supposed to be completed by August 2022. On campus housing sits at approximately 5,700 and once all this is completed (tear down and construction), App will have roughly 6,000-6,100 beds on campus.

Already known but just a reminder, Owens demolition is set for this December/January '19. Construction of new EZ facility set to begin in March/April 2019. Building is set to begin in 2019-2020 at the old high school site for the track, outdoor tennis and softball.
Proud to be a Mountaineer!! Can't wait to get back on campus on 11/24. Go Apps!!!
Hope they have plenty of wheelchair accessible areas! Hell by 2024 I may need them!!!!!!!!!!!!!

User avatar
Gonzo
Posts: 4894
Joined: Mon Aug 27, 2012 2:11 pm
School: Appalachian State
Has thanked: 564 times
Been thanked: 1975 times

Re: Big news coming soon?

Unread post by Gonzo » Wed Oct 10, 2018 2:38 pm

asu66 wrote:
Wed Oct 03, 2018 1:33 am
Cross your fingers. By this time next week, the "App State faithful" should be celebrating...
It's two hours past "this time [last] week."

Put up or shut up. Your credibility is at stake. ;)

User avatar
8993
Posts: 509
Joined: Fri Jan 25, 2013 1:18 am
School: Appalachian State
Has thanked: 224 times
Been thanked: 312 times

Re: Big news coming soon?

Unread post by 8993 » Wed Oct 10, 2018 3:01 pm

As much as I love juicy news, I don't like the anticipation of having to wait forever for it. Maybe we could all just be pleasantly surprised next time...?

User avatar
HighPointApp
Posts: 3594
Joined: Mon Sep 22, 2008 2:15 pm
School: Appalachian State
Has thanked: 1484 times
Been thanked: 562 times

Re: Big news coming soon?

Unread post by HighPointApp » Wed Oct 10, 2018 3:04 pm

#Fakenews

What a waste of time. But at least I have been entertained.
Give 'em Hell!
Class of ‘96

AppfaninCAALand
Posts: 753
Joined: Thu Aug 09, 2012 8:44 pm
School: Appalachian State
Location: Richmond, VA
Has thanked: 200 times
Been thanked: 415 times

Re: Big news coming soon?

Unread post by AppfaninCAALand » Wed Oct 10, 2018 3:38 pm

Let's cut him some slack, he said "cross your fingers" and "should". What ever his news is, it is just taking longer to work out or has fallen through.

They don't announce the Game Day location until Saturday. ;)

User avatar
asu66
Posts: 26893
Joined: Tue Jun 27, 2000 1:21 pm
School: Appalachian State
Has thanked: 1945 times
Been thanked: 2006 times

Re: Big news coming soon?

Unread post by asu66 » Wed Oct 10, 2018 3:51 pm

OK, OK don't set your hair on fire. Criticize me as you wish. I can handle it! I couldn't post this before it was approved and made public by the UNC-Board of Governors. The BOG met for its regular monthly meeting today in Chapel Hill.

The BOG was being asked to approve a marathon construction program for Appalachian that'll unfold over the next 5-6 years (allowing for weather issues, architectural change orders and cost overruns) that will substantially change Appalachian's campus infrastructure, university profile and ability to recruit upper-echelon students, student-athletes, faculty members, leadership and coaches. Multiple sources are reporting that approvals were granted at today's BOG meeting. Thanks to Moonshine and others for noting the approvals in this afternoon's posts.

Despite the approaching tropical weather, this news makes today a fabulous day for App and The High Country. The official bird of Appalachian, the mountain songbird, is about to be joined by the *construction crane.* Pardon that old corny line, but this means that starting with the new School of Health Sciences complex and continuing with the Millenial Campus (P3 housing), Sanford, North end zone and 105 projects, Appalachian is and will be undergoing the largest, continuing campus construction initiatives in our lifetimes.

Methinks that makes it great to be App State Mountaineers.
Last edited by asu66 on Wed Oct 10, 2018 4:37 pm, edited 2 times in total.
If it happens to the Apps, it happens to me!

NoLongerLurking
Posts: 1396
Joined: Sun Sep 28, 2014 2:07 pm
School: Appalachian State
Location: Boone
Has thanked: 586 times
Been thanked: 515 times

Re: Big news coming soon?

Unread post by NoLongerLurking » Wed Oct 10, 2018 3:59 pm

So.... ice?

User avatar
ArmantiWaterSafety
Posts: 769
Joined: Thu Nov 10, 2016 11:31 am
School: Appalachian State
Location: Hickory, NC
Has thanked: 305 times
Been thanked: 501 times
Contact:

Re: Big news coming soon?

Unread post by ArmantiWaterSafety » Wed Oct 10, 2018 4:17 pm

Definitely huge for the school, can't wait to see Owens GONE. What an eyesore that is. Really, with the track gone and Owens replaced, the stadium will look big league for the first time ever, and hopefully we'll get some decent televised games with a nationally ranked team by that time!

AppSt94
Posts: 9531
Joined: Thu Aug 09, 2012 6:39 pm
School: Appalachian State
Location: Huntersville, NC
Has thanked: 6321 times
Been thanked: 3915 times

Re: Big news coming soon?

Unread post by AppSt94 » Wed Oct 10, 2018 4:21 pm

ArmantiWaterSafety wrote:
Wed Oct 10, 2018 4:17 pm
Definitely huge for the school, can't wait to see Owens GONE. What an eyesore that is. Really, with the track gone and Owens replaced, the stadium will look big league for the first time ever, and hopefully we'll get some decent televised games with a nationally ranked team by that time!
Just as long as they don’t install a waterfall fixture.

WASU 93
Posts: 1501
Joined: Sat Sep 05, 2015 10:51 pm
School: Appalachian State
Has thanked: 860 times
Been thanked: 984 times

Re: Big news coming soon?

Unread post by WASU 93 » Wed Oct 10, 2018 4:36 pm

AppSt94 wrote:
Wed Oct 10, 2018 4:21 pm
ArmantiWaterSafety wrote:
Wed Oct 10, 2018 4:17 pm
Definitely huge for the school, can't wait to see Owens GONE. What an eyesore that is. Really, with the track gone and Owens replaced, the stadium will look big league for the first time ever, and hopefully we'll get some decent televised games with a nationally ranked team by that time!
Just as long as they don’t install a waterfall fixture.
But ours would light up on a regular basis.....

Post Reply Previous topicNext topic

Return to “Appalachian General Discussion”