What's next for stadium projects?
-
- Posts: 1478
- Joined: Tue Sep 01, 2015 8:55 pm
- School: Appalachian State
- Has thanked: 1507 times
- Been thanked: 1306 times
-
- Posts: 2653
- Joined: Mon Dec 24, 2012 9:38 am
- School: Appalachian State
- Has thanked: 526 times
- Been thanked: 1430 times
-
- Posts: 5760
- Joined: Sun Dec 22, 2019 9:32 am
- School: Appalachian State
- Has thanked: 2185 times
- Been thanked: 3785 times
Re: What's next for stadium projects?
If we are talking KBS Stadium only, I hope we get better stadium lighting and better placement for TV cameras. Tough viewing a game when the camera is perched on top of Howards Knob..lol
Today I Give My All For Appalachian State!!
#FreeMillerHillForMoMoney!!
#FreeMillerHillForMoMoney!!
- APPdiesel
- Posts: 2680
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 820 times
- Been thanked: 1513 times
- Contact:
Re: What's next for stadium projects?
I’ve heard the eventual plan is to connect the exterior concourse of the as-yet-unfinished NEZ complex with the west side, but I haven’t seen anything official about it.
Sports talk host & content creator on The Fan Upstate, 97.7 FM Greenville/97.1 FM Spartanburg/FREE AUDACY APP.
http://www.twitter.com/dieselonradio
http://www.twitter.com/dieselonradio
-
- Posts: 1815
- Joined: Thu Jan 30, 2014 11:15 am
- School: Appalachian State
- Has thanked: 334 times
- Been thanked: 741 times
Re: What's next for stadium projects?
I think the next football projects we’ll see are expanding the indoor facility andcosmetic touch ups like major power washing of the concrete. Before the East and west sides are connected the east side needs to be torn down and re-done. The only eye sore left at KBS.
-
- Posts: 1396
- Joined: Sun Sep 28, 2014 2:07 pm
- School: Appalachian State
- Location: Boone
- Has thanked: 586 times
- Been thanked: 515 times
- canes_mj
- Posts: 567
- Joined: Tue Oct 16, 2012 6:41 pm
- School: Appalachian State
- Location: Hillsborough, NC
- Has thanked: 105 times
- Been thanked: 303 times
- canes_mj
- Posts: 567
- Joined: Tue Oct 16, 2012 6:41 pm
- School: Appalachian State
- Location: Hillsborough, NC
- Has thanked: 105 times
- Been thanked: 303 times
Re: What's next for stadium projects?
Hey now!!! I LOVE my East side seats!Yosef10 wrote: ↑Sun Jan 17, 2021 10:04 amI think the next football projects we’ll see are expanding the indoor facility andcosmetic touch ups like major power washing of the concrete. Before the East and west sides are connected the east side needs to be torn down and re-done. The only eye sore left at KBS.
-
- Posts: 11264
- Joined: Thu Aug 09, 2012 6:39 pm
- School: Appalachian State
- Location: Huntersville, NC
- Has thanked: 7554 times
- Been thanked: 4824 times
Re: What's next for stadium projects?
The concrete on the West side is in disrepair in some spots. I think the West side stands need to be replaced first.
- AppStateNews
- Posts: 2736
- Joined: Thu Aug 09, 2012 7:36 am
- School: Appalachian State
- Has thanked: 220 times
- Been thanked: 2289 times
Re: What's next for stadium projects?
I know Gillin had mentioned wanting to complete the connection of both sides with the North End zone by the time UNCheat comes to Boone..
But that was pre-Covid and messing up the entire budget and forecasting.
But that was pre-Covid and messing up the entire budget and forecasting.
tAPPedInSports.net
Not affiliated with the above website
Not affiliated with the above website
- SayYesToTheRock
- Posts: 340
- Joined: Sun Aug 26, 2012 10:26 pm
- School: Appalachian State
- Location: Boone, NC
- Has thanked: 49 times
- Been thanked: 245 times
Re: What's next for stadium projects?
A NEZ connector concourse seems like the only "small potatoes" project left. After that, we could be looking at 10 years out for things like replacing the East or West stands.
We've had some extreme wish fulfillment in the last year: track removal, NEZ facility, and re-grading the hill. I'm content for the moment. Excited for the new track, softball, and tennis facilities at App 105.
We've had some extreme wish fulfillment in the last year: track removal, NEZ facility, and re-grading the hill. I'm content for the moment. Excited for the new track, softball, and tennis facilities at App 105.
-
- Posts: 233
- Joined: Mon Oct 19, 2015 6:02 pm
- School: Appalachian State
- Has thanked: 1 time
- Been thanked: 57 times
Re: What's next for stadium projects?
I suspect this is the case. Finishing up the NEZ project as well a a NEZ connector concourse will probably be the only new major KBS upgrades for the next 8-10 years. Gotta pay those bills...SayYesToTheRock wrote: ↑Mon Jan 18, 2021 3:56 pmA NEZ connector concourse seems like the only "small potatoes" project left. After that, we could be looking at 10 years out for things like replacing the East or West stands.
We've had some extreme wish fulfillment in the last year: track removal, NEZ facility, and re-grading the hill. I'm content for the moment. Excited for the new track, softball, and tennis facilities at App 105.
- asu66
- Posts: 26935
- Joined: Tue Jun 27, 2000 1:21 pm
- School: Appalachian State
- Has thanked: 2044 times
- Been thanked: 2031 times
Re: What's next for stadium projects?
Folks, App State Nation has to raise some serious revenue over the next three to six years to wipe out some of the debt already incurred. Year 2020 hasn't been kind to collegiate athletic programs anywhere--but it has been an appsolute financial disaster for our Alma Mater.
Proud triple-degree App grad--Classes of '66, '70 and '81.
If it happens to the Apps, it happens to me!
If it happens to the Apps, it happens to me!
-
- Posts: 1693
- Joined: Sat Sep 05, 2015 10:51 pm
- School: Appalachian State
- Has thanked: 953 times
- Been thanked: 1102 times
Re: What's next for stadium projects?
canes_mj wrote: ↑Mon Jan 18, 2021 2:21 pmHey now!!! I LOVE my East side seats!Yosef10 wrote: ↑Sun Jan 17, 2021 10:04 amI think the next football projects we’ll see are expanding the indoor facility andcosmetic touch ups like major power washing of the concrete. Before the East and west sides are connected the east side needs to be torn down and re-done. The only eye sore left at KBS.
Likewise. I love the sightlines from the top of the East side and think the Concourse functions better. I'm sure we could cosmetically improve the "suites" on the top of East and could redo/dress up the ramps (possibly eliminating one of them with a connected concourse would help)
However, if we fill up the East Side for every game, there's no way it's an Eyesore.

- APPdiesel
- Posts: 2680
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 820 times
- Been thanked: 1513 times
- Contact:
Re: What's next for stadium projects?
The ramps are bad, the aluminum is bad, but i don’t think anything over there needs to be replaced. It could get a brick facade to match the west side and be just fine.
Sports talk host & content creator on The Fan Upstate, 97.7 FM Greenville/97.1 FM Spartanburg/FREE AUDACY APP.
http://www.twitter.com/dieselonradio
http://www.twitter.com/dieselonradio
- BeauFoster
- Posts: 6870
- Joined: Wed Sep 06, 2006 11:42 am
- School: Appalachian State
- Location: In a cubicle
- Has thanked: 1739 times
- Been thanked: 2163 times
Re: What's next for stadium projects?
When I win the mega millions tonight, I'm going to Doug and asking him how much he needs to get rid of those ramps. Otherwise, I think everything is fine with the east stands.
Give 'em hell!
- APPdiesel
- Posts: 2680
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 820 times
- Been thanked: 1513 times
- Contact:
Re: What's next for stadium projects?
Sports talk host & content creator on The Fan Upstate, 97.7 FM Greenville/97.1 FM Spartanburg/FREE AUDACY APP.
http://www.twitter.com/dieselonradio
http://www.twitter.com/dieselonradio