-
- Birthdays
- Nisears (31)
What's next for stadium projects?
-
- Posts: 1949
- Joined: Mon Dec 24, 2012 9:38 am
- School: Appalachian State
- Has thanked: 370 times
- Been thanked: 971 times
-
- Posts: 504
- Joined: Sun Dec 22, 2019 9:32 am
- School: Appalachian State
- Has thanked: 80 times
- Been thanked: 267 times
Re: What's next for stadium projects?
If we are talking KBS Stadium only, I hope we get better stadium lighting and better placement for TV cameras. Tough viewing a game when the camera is perched on top of Howards Knob..lol
Today I Give My All For Appalachian State!!
- APPdiesel
- Posts: 1575
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 363 times
- Been thanked: 712 times
- Contact:
Re: What's next for stadium projects?
I’ve heard the eventual plan is to connect the exterior concourse of the as-yet-unfinished NEZ complex with the west side, but I haven’t seen anything official about it.
-
- Posts: 1518
- Joined: Thu Jan 30, 2014 11:15 am
- School: Appalachian State
- Has thanked: 265 times
- Been thanked: 552 times
Re: What's next for stadium projects?
I think the next football projects we’ll see are expanding the indoor facility andcosmetic touch ups like major power washing of the concrete. Before the East and west sides are connected the east side needs to be torn down and re-done. The only eye sore left at KBS.
-
- Posts: 1353
- Joined: Sun Sep 28, 2014 2:07 pm
- School: Appalachian State
- Location: Boone
- Has thanked: 569 times
- Been thanked: 503 times
- canes_mj
- Posts: 332
- Joined: Tue Oct 16, 2012 6:41 pm
- School: Appalachian State
- Location: Hillsborough, NC
- Has thanked: 33 times
- Been thanked: 93 times
- canes_mj
- Posts: 332
- Joined: Tue Oct 16, 2012 6:41 pm
- School: Appalachian State
- Location: Hillsborough, NC
- Has thanked: 33 times
- Been thanked: 93 times
Re: What's next for stadium projects?
Hey now!!! I LOVE my East side seats!Yosef10 wrote: ↑Sun Jan 17, 2021 10:04 amI think the next football projects we’ll see are expanding the indoor facility andcosmetic touch ups like major power washing of the concrete. Before the East and west sides are connected the east side needs to be torn down and re-done. The only eye sore left at KBS.
-
- Posts: 4919
- Joined: Thu Aug 09, 2012 6:39 pm
- School: Appalachian State
- Location: Palmetto, FL
- Has thanked: 2310 times
- Been thanked: 1390 times
Re: What's next for stadium projects?
The concrete on the West side is in disrepair in some spots. I think the West side stands need to be replaced first.
- AppStateNews
- Posts: 881
- Joined: Thu Aug 09, 2012 7:36 am
- School: Appalachian State
- Has thanked: 88 times
- Been thanked: 404 times
Re: What's next for stadium projects?
I know Gillin had mentioned wanting to complete the connection of both sides with the North End zone by the time UNCheat comes to Boone..
But that was pre-Covid and messing up the entire budget and forecasting.
But that was pre-Covid and messing up the entire budget and forecasting.
- SayYesToTheRock
- Posts: 329
- Joined: Sun Aug 26, 2012 10:26 pm
- School: Appalachian State
- Location: Boone, NC
- Has thanked: 49 times
- Been thanked: 233 times
Re: What's next for stadium projects?
A NEZ connector concourse seems like the only "small potatoes" project left. After that, we could be looking at 10 years out for things like replacing the East or West stands.
We've had some extreme wish fulfillment in the last year: track removal, NEZ facility, and re-grading the hill. I'm content for the moment. Excited for the new track, softball, and tennis facilities at App 105.
We've had some extreme wish fulfillment in the last year: track removal, NEZ facility, and re-grading the hill. I'm content for the moment. Excited for the new track, softball, and tennis facilities at App 105.
-
- Posts: 109
- Joined: Mon Oct 19, 2015 6:02 pm
- School: Appalachian State
- Has thanked: 1 time
- Been thanked: 17 times
Re: What's next for stadium projects?
I suspect this is the case. Finishing up the NEZ project as well a a NEZ connector concourse will probably be the only new major KBS upgrades for the next 8-10 years. Gotta pay those bills...SayYesToTheRock wrote: ↑Mon Jan 18, 2021 3:56 pmA NEZ connector concourse seems like the only "small potatoes" project left. After that, we could be looking at 10 years out for things like replacing the East or West stands.
We've had some extreme wish fulfillment in the last year: track removal, NEZ facility, and re-grading the hill. I'm content for the moment. Excited for the new track, softball, and tennis facilities at App 105.
- asu66
- Posts: 26412
- Joined: Tue Jun 27, 2000 1:21 pm
- School: Appalachian State
- Has thanked: 1399 times
- Been thanked: 1671 times
Re: What's next for stadium projects?
Folks, App State Nation has to raise some serious revenue over the next three to six years to wipe out some of the debt already incurred. Year 2020 hasn't been kind to collegiate athletic programs anywhere--but it has been an appsolute financial disaster for our Alma Mater.
If it happens to the Apps, it happens to me!
-
- Posts: 696
- Joined: Sat Sep 05, 2015 10:51 pm
- School: Appalachian State
- Has thanked: 325 times
- Been thanked: 381 times
Re: What's next for stadium projects?
canes_mj wrote: ↑Mon Jan 18, 2021 2:21 pmHey now!!! I LOVE my East side seats!Yosef10 wrote: ↑Sun Jan 17, 2021 10:04 amI think the next football projects we’ll see are expanding the indoor facility andcosmetic touch ups like major power washing of the concrete. Before the East and west sides are connected the east side needs to be torn down and re-done. The only eye sore left at KBS.
Likewise. I love the sightlines from the top of the East side and think the Concourse functions better. I'm sure we could cosmetically improve the "suites" on the top of East and could redo/dress up the ramps (possibly eliminating one of them with a connected concourse would help)
However, if we fill up the East Side for every game, there's no way it's an Eyesore.

- APPdiesel
- Posts: 1575
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 363 times
- Been thanked: 712 times
- Contact:
Re: What's next for stadium projects?
The ramps are bad, the aluminum is bad, but i don’t think anything over there needs to be replaced. It could get a brick facade to match the west side and be just fine.
- BeauFoster
- Posts: 5665
- Joined: Wed Sep 06, 2006 11:42 am
- School: Appalachian State
- Location: In a cubicle
- Has thanked: 679 times
- Been thanked: 888 times
Re: What's next for stadium projects?
When I win the mega millions tonight, I'm going to Doug and asking him how much he needs to get rid of those ramps. Otherwise, I think everything is fine with the east stands.
Give 'em hell!
- APPdiesel
- Posts: 1575
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 363 times
- Been thanked: 712 times
- Contact:
Re: What's next for stadium projects?
-
- Who is online
- In total there are 239 users online :: 0 registered, 1 hidden and 238 guests
Most users ever online was 1927 on Tue Mar 17, 2020 3:27 am
Users browsing this forum: No registered users and 238 guests