North End Zone Project Gets Green Light

User avatar
CornCobPipes
Posts: 1407
Joined: Thu Aug 09, 2012 9:22 pm
School: Appalachian State
Has thanked: 1085 times
Been thanked: 351 times

Re: North End Zone Project Gets Green Light

Unread post by CornCobPipes » Mon Nov 13, 2017 11:42 am

How soon or when could we expect to see detailed final renderings or models of the finished product from multiple views?

When we had our last expansion we were given the virtual video that was fairly accurate presentation of what we were getting.

The primary question I wanted answered is how are the North End Zone expansion plans (more specifically seating/ stands) being designed in relation to enclosing the sidelines to field. The concept most have considered is building new lower deck on East side and shifting football field closer to West side. With this in mind I am curious to the symmetry planned with the new end zone project and enclosure plans.
KICK ASS!!!

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: North End Zone Project Gets Green Light

Unread post by appgrouch » Mon Nov 13, 2017 12:28 pm

CornCobPipes wrote:
Mon Nov 13, 2017 11:42 am
How soon or when could we expect to see detailed final renderings or models of the finished product from multiple views?

When we had our last expansion we were given the virtual video that was fairly accurate presentation of what we were getting.

The primary question I wanted answered is how are the North End Zone expansion plans (more specifically seating/ stands) being designed in relation to enclosing the sidelines to field. The concept most have considered is building new lower deck on East side and shifting football field closer to West side. With this in mind I am curious to the symmetry planned with the new end zone project and enclosure plans.
They were still taking core samples at the end of last week, so "final" won't be for a while. That and most of the renderings I have seen on projects as of late have had issues with scale so objects in video may be roomyer than they will in real life. Fly throughs don't look as impressive if you are bumping into walls.
That's what I do. I gripe and I know things.

User avatar
AppStateMtneer
Posts: 462
Joined: Mon Jan 11, 2016 8:46 pm
School: Appalachian State
Has thanked: 90 times
Been thanked: 195 times

Re: North End Zone Project Gets Green Light

Unread post by AppStateMtneer » Mon Nov 13, 2017 7:04 pm

Boonegoon wrote:
Mon Nov 13, 2017 11:34 am
Is there a rendering or drawing of the new North End Zone plan that I can access?
Image

Boonegoon
Posts: 255
Joined: Fri Aug 29, 2014 8:07 am
School: Appalachian State
Has thanked: 31 times
Been thanked: 103 times

Re: North End Zone Project Gets Green Light

Unread post by Boonegoon » Mon Nov 13, 2017 7:46 pm

AppStateMtneer wrote:
Mon Nov 13, 2017 7:04 pm
Boonegoon wrote:
Mon Nov 13, 2017 11:34 am
Is there a rendering or drawing of the new North End Zone plan that I can access?
Image
Yep, that's it! Thanks, it's been a while since I've been to the Rock.... :lol:

User avatar
App91
Posts: 3785
Joined: Mon Mar 14, 2005 12:28 pm
School: Appalachian State
Has thanked: 633 times
Been thanked: 450 times

Re: North End Zone Project Gets Green Light

Unread post by App91 » Mon Nov 13, 2017 8:00 pm

Any idea what will happen with the visitor locker room, if they take owens down this year, have a couple years without it?

Dmanuhone
Posts: 2380
Joined: Mon Feb 25, 2002 10:24 pm
School: Appalachian State
Location: Parts Unknown
Been thanked: 38 times

Re: North End Zone Project Gets Green Light

Unread post by Dmanuhone » Mon Nov 13, 2017 8:10 pm

How about swapping end zones. Put the new construction in the South end zone and move the grass bank (closer in )to the North. Just thinking outside the box.
Image
Victory Yosef visited the Virgin Islands, now they are just called the Islands

User avatar
ASU-FTW
Posts: 979
Joined: Sun Aug 12, 2012 4:31 pm
School: Appalachian State
Location: Greensboro
Has thanked: 82 times
Been thanked: 188 times

Re: North End Zone Project Gets Green Light

Unread post by ASU-FTW » Mon Nov 13, 2017 11:37 pm

App91 wrote:
Mon Nov 13, 2017 8:00 pm
Any idea what will happen with the visitor locker room, if they take owens down this year, have a couple years without it?
They could use the woods behind the grass hill.

DontPlayWithYosef
Posts: 91
Joined: Sat Aug 20, 2016 2:42 pm
School: Appalachian State
Has thanked: 15 times
Been thanked: 50 times

Re: North End Zone Project Gets Green Light

Unread post by DontPlayWithYosef » Mon Nov 13, 2017 11:51 pm

More seats in the south end has my vote as well. Love tailgating in the stadium lot with glimpses of the scoreboard and being close to the action. Leave the north side as open as possible & put a couple of double deckers on either side of the new Jumbotron with club seating. Great views of Howard's Knob & surroundings not blocked by new buildings/dorms.

Lot of season left in 2017...GO APP!

tigersef
Posts: 34
Joined: Sat Aug 25, 2012 2:32 pm
Has thanked: 1 time
Been thanked: 16 times

Re: North End Zone Project Gets Green Light

Unread post by tigersef » Tue Nov 14, 2017 12:13 am

Retaining the south end zone with a regraded hill (once the track is removed) is important to providing a seating area for families who want to enjoy this area while maintaining a natural edge of the stadium abutting the forested hillside. This is a unique feature in KBS and should be preserved.

The previously released renderings of the north endzone looked great, but the one thing they were missing is seating below the new club area extending down to the field level. Providing a continuous seating bowl below the concourse level on the north, east and west sides of the stadium will maintain an electric atmosphere and help avoid a “dead zone” that some end zone buildings create in college stadiums.

BTK2000
Posts: 420
Joined: Mon Oct 01, 2012 12:06 pm
School: Appalachian State
Has thanked: 33 times
Been thanked: 187 times

Re: North End Zone Project Gets Green Light

Unread post by BTK2000 » Tue Nov 14, 2017 12:30 am

I'll be interested to see if the project is centered on the field from sideline to sideline.

Let's get real, if the track goes away there will be a lot of empty space between the east/west stands and the feild. If it offset towards the "app side then I would assume the "state side will be demolished in the future and rebuilt. closer. If it's centered then there is is gonna be a lot of green between you and the field because we all know lowering the field is impossible.

User avatar
APPdiesel
Posts: 2565
Joined: Thu Jul 16, 2015 5:53 pm
School: Appalachian State
Has thanked: 788 times
Been thanked: 1422 times
Contact:

Re: North End Zone Project Gets Green Light

Unread post by APPdiesel » Tue Nov 14, 2017 1:39 am

Wide sidelines would be my guess. Considering how much we just spent to install the scoreboard, moving either side inward would render the score board off center and off symmetry. That's not happening. It's either go the extremely difficult route of blasting bedrock and rerouting a creek at high cost or having wide sidelines.
"Sports talk's most decent producer" on 97.1 The Fan Upstate

http://www.twitter.com/dieselonradio

User avatar
HkyMtneer
Posts: 914
Joined: Mon Aug 20, 2012 4:51 pm
School: Appalachian State
Location: Hickory, NC
Has thanked: 131 times
Been thanked: 345 times
Contact:

Re: North End Zone Project Gets Green Light

Unread post by HkyMtneer » Tue Nov 14, 2017 7:35 am

APPdiesel wrote:
Tue Nov 14, 2017 1:39 am
Wide sidelines would be my guess. Considering how much we just spent to install the scoreboard, moving either side inward would render the score board off center and off symmetry. That's not happening. It's either go the extremely difficult route of blasting bedrock and rerouting a creek at high cost or having wide sidelines.
That would be a pretty easy fix. Simply add another support column in either direction and expand the board in that direction, and voila, back to being centered. I mean, it's going to need to be expanded in 5 years or less anyways...nature of the beast. I'm already tired of hearing about how much "more massive" Troy's new board is going to be.

User avatar
NO.2
Posts: 777
Joined: Thu Mar 26, 2015 7:34 am
School: Appalachian State
Has thanked: 194 times
Been thanked: 340 times

Re: North End Zone Project Gets Green Light

Unread post by NO.2 » Tue Nov 14, 2017 8:13 am

HkyMtneer wrote:
Tue Nov 14, 2017 7:35 am
APPdiesel wrote:
Tue Nov 14, 2017 1:39 am
Wide sidelines would be my guess. Considering how much we just spent to install the scoreboard, moving either side inward would render the score board off center and off symmetry. That's not happening. It's either go the extremely difficult route of blasting bedrock and rerouting a creek at high cost or having wide sidelines.
That would be a pretty easy fix. Simply add another support column in either direction and expand the board in that direction, and voila, back to being centered. I mean, it's going to need to be expanded in 5 years or less anyways...nature of the beast. I'm already tired of hearing about how much "more massive" Troy's new board is going to be.
They can have the bigger board, I'd rather have the better endzone facility. Theirs looks like a cheap Monticello knock-off.

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: North End Zone Project Gets Green Light

Unread post by appgrouch » Tue Nov 14, 2017 8:49 am

Lower stands rebuilt (they need it) and moved in 4 lanes (half the track).
Bank moved to inside radius of Track.

Best pic I could find for a quick and dirty mock up.

Image
That's what I do. I gripe and I know things.

User avatar
AtlAppMan
Posts: 2026
Joined: Fri Aug 10, 2012 3:23 pm
School: Appalachian State
Location: ATL
Has thanked: 95 times
Been thanked: 1261 times

Re: North End Zone Project Gets Green Light

Unread post by AtlAppMan » Tue Nov 14, 2017 9:22 am

blackbox.jpeg
blackbox.jpeg (6.42 KiB) Viewed 4898 times

Saint3333
Posts: 12970
Joined: Tue Jun 27, 2000 8:42 am
Has thanked: 2966 times
Been thanked: 4562 times

Re: North End Zone Project Gets Green Light

Unread post by Saint3333 » Tue Nov 14, 2017 9:55 am

I'd like to keep our locker room in the tower and devote as little space as possible to the visitor locker room in the north endzone complex.

Seems silly to not continue utilizing the great locker room we already have.

Is it me or is the video board slightly more towards the west side in that overview picture?

MtnMan09
Posts: 457
Joined: Mon Nov 30, 2009 1:44 pm
School: Appalachian State
Has thanked: 254 times
Been thanked: 181 times

Re: North End Zone Project Gets Green Light

Unread post by MtnMan09 » Tue Nov 14, 2017 10:06 am

They are not moving any stands according to the YC person I met with last week. That would cost way to much money. The track is coming out and there will just be extended sidelines with turf. He did say they may play around with some ways to make use of the new space. One thing he mentioned might be a poor man's version of field "suites" like at Jerry's World. Im sure this would be more akin to renting tailgate tent areas actually on the field. I think Texas A&M or someone may do this.

roachgone
Posts: 137
Joined: Thu Dec 19, 2013 9:58 am
School: Appalachian State
Has thanked: 1 time
Been thanked: 94 times

Re: North End Zone Project Gets Green Light

Unread post by roachgone » Tue Nov 14, 2017 10:42 am

If yall will look at other large stadiums the space between the stands and sidelines is about what ours will be without the track. UGA and hedges etc. Just need to get endzone seating closer to field which will be possible w/o track.

User avatar
Rekdiver
Posts: 7519
Joined: Mon Aug 13, 2012 1:14 pm
School: Appalachian State
Has thanked: 1427 times
Been thanked: 3707 times

Re: North End Zone Project Gets Green Light

Unread post by Rekdiver » Tue Nov 14, 2017 11:07 am

We should plant and maintain dwarf firs!!!! Touchdown Santa will love that!

User avatar
canes_mj
Posts: 521
Joined: Tue Oct 16, 2012 6:41 pm
School: Appalachian State
Location: Hillsborough, NC
Has thanked: 67 times
Been thanked: 261 times

Re: North End Zone Project Gets Green Light

Unread post by canes_mj » Tue Nov 14, 2017 11:27 am

MtnMan09 wrote:
Tue Nov 14, 2017 10:06 am
They are not moving any stands according to the YC person I met with last week. That would cost way to much money. The track is coming out and there will just be extended sidelines with turf. He did say they may play around with some ways to make use of the new space. One thing he mentioned might be a poor man's version of field "suites" like at Jerry's World. Im sure this would be more akin to renting tailgate tent areas actually on the field. I think Texas A&M or someone may do this.
This is a good idea. I've thought they should do some kind of on field seating ever since the Miami game where they had standing room tickets behind the south endzone. Pretty easy to do, and an easy source of revenue via another type of "premium" seating. Hopefully if they do it, they'll make it look professional. Not sure if anyone noticed but it looked like Louisiana-Monroe had something like this behind one of their endzones, but it looked really cheap as it was a bunch of fold out tables set up.