Here is the link to the fall sports streaming schedule.

https://appstatesports.com/news/2023/8/ ... edule.aspx

Appstate Endzone Camera

User avatar
HkyMtneer
Posts: 914
Joined: Mon Aug 20, 2012 4:51 pm
School: Appalachian State
Location: Hickory, NC
Has thanked: 131 times
Been thanked: 345 times
Contact:

Re: Appstate Endzone Camera

Unread post by HkyMtneer » Thu May 02, 2019 6:29 pm

Saint3333 wrote:
Thu May 02, 2019 2:47 pm
I have to wonder how fund raising is going with these delays.
I've also been curious about this, especially with all the recent changes in the athletics development office that appears to have occurred...though we haven't heard much about those.

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Fri May 03, 2019 3:29 pm

Saint3333 wrote:
Thu May 02, 2019 2:47 pm
I have to wonder how fund raising is going with these delays.
Chicken or Egg.
That's what I do. I gripe and I know things.

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Mon May 13, 2019 2:59 pm

Kidd Brewer Stadium – North End Zone
Construction of a new multi-story building to include a kitchen for catering events on campus, beautiful meeting and banquet space, coaches' offices, locker rooms, weight training, hydrotherapy, a team store, ticketing, nutrition science research areas, and premium seating for 1,000 football fans.

Why? Owens, like many of us, was starting to decline at 45 years old. The new facility will provide much needed year-round meeting space and puts a great face on the entrance to the stadium.

Current-December 2020
That's what I do. I gripe and I know things.

NewApp
Posts: 7491
Joined: Tue Mar 26, 2013 8:59 am
School: Appalachian State
Has thanked: 958 times
Been thanked: 900 times
Contact:

Re: Appstate Endzone Camera

Unread post by NewApp » Mon May 13, 2019 6:30 pm

appgrouch wrote:
Mon May 13, 2019 2:59 pm
Kidd Brewer Stadium – North End Zone
Construction of a new multi-story building to include a kitchen for catering events on campus, beautiful meeting and banquet space, coaches' offices, locker rooms, weight training, hydrotherapy, a team store, ticketing, nutrition science research areas, and premium seating for 1,000 football fans.

Why? Owens, like many of us, was starting to decline at 45 years old. The new facility will provide much needed year-round meeting space and puts a great face on the entrance to the stadium.

Current-December 2020
Aren't hydrotherapy and weight training already available in the present complex?
NewApp formerly known as JCline
If you can't take it, don't dish it out.
Google SUX

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Tue May 14, 2019 7:28 am

NewApp wrote:
Mon May 13, 2019 6:30 pm
appgrouch wrote:
Mon May 13, 2019 2:59 pm
Kidd Brewer Stadium – North End Zone
Construction of a new multi-story building to include a kitchen for catering events on campus, beautiful meeting and banquet space, coaches' offices, locker rooms, weight training, hydrotherapy, a team store, ticketing, nutrition science research areas, and premium seating for 1,000 football fans.

Why? Owens, like many of us, was starting to decline at 45 years old. The new facility will provide much needed year-round meeting space and puts a great face on the entrance to the stadium.

Current-December 2020
Aren't hydrotherapy and weight training already available in the present complex?
Prior to Owens coming down, the facilities in the tower was primarily FB and BBall(?) only. A majority of the other sports were still using the WT & AT in Owens.

The main reason I posted that was that the date is currently Dec of 2020 for completion.
That's what I do. I gripe and I know things.

Appstate88
Posts: 2647
Joined: Mon Dec 24, 2012 9:38 am
School: Appalachian State
Has thanked: 526 times
Been thanked: 1427 times

Re: Appstate Endzone Camera

Unread post by Appstate88 » Tue May 14, 2019 11:10 am

appgrouch wrote:
Tue May 14, 2019 7:28 am
NewApp wrote:
Mon May 13, 2019 6:30 pm
appgrouch wrote:
Mon May 13, 2019 2:59 pm
Kidd Brewer Stadium – North End Zone
Construction of a new multi-story building to include a kitchen for catering events on campus, beautiful meeting and banquet space, coaches' offices, locker rooms, weight training, hydrotherapy, a team store, ticketing, nutrition science research areas, and premium seating for 1,000 football fans.

Why? Owens, like many of us, was starting to decline at 45 years old. The new facility will provide much needed year-round meeting space and puts a great face on the entrance to the stadium.

Current-December 2020
Aren't hydrotherapy and weight training already available in the present complex?
Prior to Owens coming down, the facilities in the tower was primarily FB and BBall(?) only. A majority of the other sports were still using the WT & AT in Owens.

The main reason I posted that was that the date is currently Dec of 2020 for completion.

What is your source for Dec 2020? I was still tracking Aug 2020 in time for home opener.
GIVE 'EM HELL APPS!

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Tue May 14, 2019 11:52 am

Appstate88 wrote:
Tue May 14, 2019 11:10 am
appgrouch wrote:
Tue May 14, 2019 7:28 am
NewApp wrote:
Mon May 13, 2019 6:30 pm
appgrouch wrote:
Mon May 13, 2019 2:59 pm
Kidd Brewer Stadium – North End Zone
Construction of a new multi-story building to include a kitchen for catering events on campus, beautiful meeting and banquet space, coaches' offices, locker rooms, weight training, hydrotherapy, a team store, ticketing, nutrition science research areas, and premium seating for 1,000 football fans.

Why? Owens, like many of us, was starting to decline at 45 years old. The new facility will provide much needed year-round meeting space and puts a great face on the entrance to the stadium.

Current-December 2020
Aren't hydrotherapy and weight training already available in the present complex?
Prior to Owens coming down, the facilities in the tower was primarily FB and BBall(?) only. A majority of the other sports were still using the WT & AT in Owens.

The main reason I posted that was that the date is currently Dec of 2020 for completion.

What is your source for Dec 2020? I was still tracking Aug 2020 in time for home opener.
Demo started late and no footings have been poured as of yet.

https://physicalplant.appstate.edu/news ... ummer-2019
That's what I do. I gripe and I know things.

Appstate88
Posts: 2647
Joined: Mon Dec 24, 2012 9:38 am
School: Appalachian State
Has thanked: 526 times
Been thanked: 1427 times

Re: Appstate Endzone Camera

Unread post by Appstate88 » Tue May 14, 2019 12:09 pm

appgrouch wrote:
Tue May 14, 2019 11:52 am
Appstate88 wrote:
Tue May 14, 2019 11:10 am
appgrouch wrote:
Tue May 14, 2019 7:28 am
NewApp wrote:
Mon May 13, 2019 6:30 pm
appgrouch wrote:
Mon May 13, 2019 2:59 pm
Kidd Brewer Stadium – North End Zone
Construction of a new multi-story building to include a kitchen for catering events on campus, beautiful meeting and banquet space, coaches' offices, locker rooms, weight training, hydrotherapy, a team store, ticketing, nutrition science research areas, and premium seating for 1,000 football fans.

Why? Owens, like many of us, was starting to decline at 45 years old. The new facility will provide much needed year-round meeting space and puts a great face on the entrance to the stadium.

Current-December 2020
Aren't hydrotherapy and weight training already available in the present complex?
Prior to Owens coming down, the facilities in the tower was primarily FB and BBall(?) only. A majority of the other sports were still using the WT & AT in Owens.

The main reason I posted that was that the date is currently Dec of 2020 for completion.

What is your source for Dec 2020? I was still tracking Aug 2020 in time for home opener.
Demo started late and no footings have been poured as of yet.

https://physicalplant.appstate.edu/news ... ummer-2019
If the NEZ project can't be completed in time for the 2020 Football Season, this information should be updated.
https://mountaineerimpact.com/end-zone- ... index.html
GIVE 'EM HELL APPS!

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Tue May 14, 2019 12:34 pm

Appstate88 wrote:
Tue May 14, 2019 12:09 pm
appgrouch wrote:
Tue May 14, 2019 11:52 am
Appstate88 wrote:
Tue May 14, 2019 11:10 am
appgrouch wrote:
Tue May 14, 2019 7:28 am
NewApp wrote:
Mon May 13, 2019 6:30 pm


Aren't hydrotherapy and weight training already available in the present complex?
Prior to Owens coming down, the facilities in the tower was primarily FB and BBall(?) only. A majority of the other sports were still using the WT & AT in Owens.

The main reason I posted that was that the date is currently Dec of 2020 for completion.

What is your source for Dec 2020? I was still tracking Aug 2020 in time for home opener.
Demo started late and no footings have been poured as of yet.

https://physicalplant.appstate.edu/news ... ummer-2019
If the NEZ project can't be completed in time for the 2020 Football Season, this information should be updated.
https://mountaineerimpact.com/end-zone- ... index.html
Doesn't say "2020 Season", just says 2020 as expected date.
That's what I do. I gripe and I know things.

User avatar
goapps93
Posts: 3757
Joined: Sat Sep 08, 2007 1:48 pm
Has thanked: 262 times
Been thanked: 885 times

Re: Appstate Endzone Camera

Unread post by goapps93 » Tue May 14, 2019 1:13 pm

Reading that maintenance report shows that there is a sense of humor within the Physical Plant.
WE ARE YOSEF!

Appstate88
Posts: 2647
Joined: Mon Dec 24, 2012 9:38 am
School: Appalachian State
Has thanked: 526 times
Been thanked: 1427 times

Re: Appstate Endzone Camera

Unread post by Appstate88 » Tue May 14, 2019 1:18 pm

appgrouch wrote:
Tue May 14, 2019 12:34 pm
Appstate88 wrote:
Tue May 14, 2019 12:09 pm
appgrouch wrote:
Tue May 14, 2019 11:52 am
Appstate88 wrote:
Tue May 14, 2019 11:10 am
appgrouch wrote:
Tue May 14, 2019 7:28 am


Prior to Owens coming down, the facilities in the tower was primarily FB and BBall(?) only. A majority of the other sports were still using the WT & AT in Owens.

The main reason I posted that was that the date is currently Dec of 2020 for completion.

What is your source for Dec 2020? I was still tracking Aug 2020 in time for home opener.
Demo started late and no footings have been poured as of yet.

https://physicalplant.appstate.edu/news ... ummer-2019
If the NEZ project can't be completed in time for the 2020 Football Season, this information should be updated.
https://mountaineerimpact.com/end-zone- ... index.html
Doesn't say "2020 Season", just says 2020 as expected date.
Gotcha, Understand... I was talking about this part of the website that talks about securing your seats for the 2020 season....

Club Seats
Seat Agreements
Seat Agreements available for 3, 5 or 7 years
Initial Seat License
Initial seat license gift of $1,000 per seat
Annual Seat Cost
Annual seat cost of $1,000 per seat due by April 30 each year of seat ownership
(due by April 30, 2020 prior to first season)

Seat Deposit Payment Plan Option
25% of total seat deposit must be paid by July 1, 2019, remainder by December 31, 2019
Secure Club Seats Today
Loge Boxes
Seat Agreements
Seat Agreements available for 3, 5 or 7 years
Initial Seat License
Initial seat license gift of $1,000 per seat
Annual Seat Cost
Annual seat cost of $2,500 per seat due by April 30 each year of seat ownership
(due by April 30, 2020 prior to first season)
Seat Deposit Payment Plan Option
25% of total seat deposit must be paid by July 1, 2019, remainder by December 31, 2019
GIVE 'EM HELL APPS!

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Tue May 14, 2019 1:50 pm

Appstate88 wrote:
Tue May 14, 2019 1:18 pm
appgrouch wrote:
Tue May 14, 2019 12:34 pm
Appstate88 wrote:
Tue May 14, 2019 12:09 pm
appgrouch wrote:
Tue May 14, 2019 11:52 am
Appstate88 wrote:
Tue May 14, 2019 11:10 am



What is your source for Dec 2020? I was still tracking Aug 2020 in time for home opener.
Demo started late and no footings have been poured as of yet.

https://physicalplant.appstate.edu/news ... ummer-2019
If the NEZ project can't be completed in time for the 2020 Football Season, this information should be updated.
https://mountaineerimpact.com/end-zone- ... index.html
Doesn't say "2020 Season", just says 2020 as expected date.
Gotcha, Understand... I was talking about this part of the website that talks about securing your seats for the 2020 season....

Club Seats
Seat Agreements
Seat Agreements available for 3, 5 or 7 years
Initial Seat License
Initial seat license gift of $1,000 per seat
Annual Seat Cost
Annual seat cost of $1,000 per seat due by April 30 each year of seat ownership
(due by April 30, 2020 prior to first season)

Seat Deposit Payment Plan Option
25% of total seat deposit must be paid by July 1, 2019, remainder by December 31, 2019
Secure Club Seats Today
Loge Boxes
Seat Agreements
Seat Agreements available for 3, 5 or 7 years
Initial Seat License
Initial seat license gift of $1,000 per seat
Annual Seat Cost
Annual seat cost of $2,500 per seat due by April 30 each year of seat ownership
(due by April 30, 2020 prior to first season)
Seat Deposit Payment Plan Option
25% of total seat deposit must be paid by July 1, 2019, remainder by December 31, 2019
To the Athletic department it is "Oh god Oh god, we have got to get this done before the season"
To the Physical Plant/Desn&Const it is "After all that will go wrong, how long will this take."
That's what I do. I gripe and I know things.

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Tue May 14, 2019 1:52 pm

goapps93 wrote:
Tue May 14, 2019 1:13 pm
Reading that maintenance report shows that there is a sense of humor within the Physical Plant.
You call is a sense of humor, the Psy Dept calls it a case study.
https://physicalplant.appstate.edu/news ... s-solution
That's what I do. I gripe and I know things.

User avatar
goapps93
Posts: 3757
Joined: Sat Sep 08, 2007 1:48 pm
Has thanked: 262 times
Been thanked: 885 times

Re: Appstate Endzone Camera

Unread post by goapps93 » Tue May 14, 2019 8:09 pm

appgrouch wrote:
Tue May 14, 2019 1:52 pm
goapps93 wrote:
Tue May 14, 2019 1:13 pm
Reading that maintenance report shows that there is a sense of humor within the Physical Plant.
You call is a sense of humor, the Psy Dept calls it a case study.
https://physicalplant.appstate.edu/news ... s-solution
Heh, tomato/potato. :D
WE ARE YOSEF!

User avatar
APPdiesel
Posts: 2565
Joined: Thu Jul 16, 2015 5:53 pm
School: Appalachian State
Has thanked: 788 times
Been thanked: 1422 times
Contact:

Re: Appstate Endzone Camera

Unread post by APPdiesel » Fri May 17, 2019 3:27 pm

I see they've started bringing in concrete piping. I saw a concrete truck out there yesterday but they didn't pour anything. Anybody know when they plan to start digging foundation?
"Sports talk's most decent producer" on 97.1 The Fan Upstate

http://www.twitter.com/dieselonradio

Apple@chin1
Posts: 321
Joined: Wed Oct 03, 2018 3:19 pm
School: Appalachian State
Location: Hobe Sound, Fl.
Has thanked: 282 times
Been thanked: 200 times

Re: Appstate Endzone Camera

Unread post by Apple@chin1 » Thu May 30, 2019 7:57 am

It looks like they’re resuming construction. It seemed like it came to a halt for a few weeks. Nice to see progress.

User avatar
appgrouch
Posts: 1114
Joined: Tue Feb 16, 2010 3:36 pm
School: Appalachian State
Location: In my seat, waiting for people to shut up and play.
Has thanked: 5 times
Been thanked: 119 times

Re: Appstate Endzone Camera

Unread post by appgrouch » Thu May 30, 2019 8:32 am

Apple@chin1 wrote:
Thu May 30, 2019 7:57 am
It looks like they’re resuming construction. It seemed like it came to a halt for a few weeks. Nice to see progress.
Right now it is mostly storm water and steam line which are part of the P3 project and the NEZ project.
That's what I do. I gripe and I know things.

User avatar
StorminASU
Posts: 361
Joined: Fri Aug 10, 2012 1:30 pm
School: Appalachian State
Location: Boone, NC
Has thanked: 218 times
Been thanked: 138 times

Re: Appstate Endzone Camera

Unread post by StorminASU » Thu May 30, 2019 9:22 am

goapps93 wrote:
Tue May 14, 2019 1:13 pm
Reading that maintenance report shows that there is a sense of humor within the Physical Plant.
That was the most entertaining maintenance report I've ever read through...probably the only one I've ever read through, haha.

User avatar
asu66
Posts: 26896
Joined: Tue Jun 27, 2000 1:21 pm
School: Appalachian State
Has thanked: 1950 times
Been thanked: 2006 times

Re: Appstate Endzone Camera

Unread post by asu66 » Thu May 30, 2019 1:43 pm

If all of the indoor space isn't enclosed by mid-Nov., the fall-2020 open house festivities will be seriously at risk. The gen. contractors and subs may be working 24x7 shifts this time next year.
If it happens to the Apps, it happens to me!

WASU 93
Posts: 1502
Joined: Sat Sep 05, 2015 10:51 pm
School: Appalachian State
Has thanked: 860 times
Been thanked: 984 times

Re: Appstate Endzone Camera

Unread post by WASU 93 » Thu May 30, 2019 10:48 pm

Perhaps the seating is completed for the start of the 2020 Season and the indoor areas are not completed until later that Winter. Purely speculation, but they could put an emphasis on the revenue producing part of the project and bring the rest of the facility online later.

Post Reply Previous topicNext topic

Return to “Appalachian General Discussion”