Page 1 of 1

New boards

Posted: Sat Aug 18, 2012 4:49 pm
by ASU02
New boards are going up on the State side between the lower and upper deck.
ImageUploadedByTapatalk1345326555.462266.jpg
ImageUploadedByTapatalk1345326555.462266.jpg (187.4 KiB) Viewed 3770 times

Re: New boards

Posted: Sat Aug 18, 2012 6:58 pm
by HighPointApp
What about new concrete to repair the areas which are safety hazards?

Re: New boards

Posted: Sat Aug 18, 2012 10:11 pm
by PBR1893-BEER-HAT-GUY
really...after redoing the "A" in the next few weeks, i might need to slap a coat of yellow paint on the treads on east side lower level steps. i mentioned this last year and nothing was done. it looks HORRIBLE!

Re: New boards

Posted: Thu Aug 23, 2012 12:15 pm
by Appfrom05
Has the installation of the boards been completed? If so does anyone have a picture of what it will look like? I read somewhere that there will be two boards per side but have not confirmed this. Thanks to anyone who may know.

Re: New boards

Posted: Thu Aug 23, 2012 12:38 pm
by Deano
All this talk of the new work done to the stadium along with the fact that we play in about a week has me giddy with excitement. I hope our guys have been training as hard as the girl below!!!!

Image

Re: New boards

Posted: Sat Aug 25, 2012 3:05 pm
by AppinVA
HansBatichon wrote:Has the installation of the boards been completed? If so does anyone have a picture of what it will look like? I read somewhere that there will be two boards per side but have not confirmed this. Thanks to anyone who may know.
I hope I am wrong, but I think that's it. One more that side on the other side of the 50 and two in the corresponding side. I was thinking there were going to be ribbon boards that ran between the 20s or 30s, but I'd suspect that they would start hanging those at the 50 and work out on both ends.

Re: New boards

Posted: Mon Sep 03, 2012 9:22 pm
by appfan725
Does anybody have any new information on the installation of the boards?